Leg for ascending
Four waypoints served on 2026-11-06 as auto-merge rate slipped away from target.
- Four planned steps served their waypoints on the press lane.MR !3394: MR !3394, merged 2026-11-06: Policy mirror brief line prints remaining=<d> and last_attempt=<outcome>:<cause>|none, trips POLICY_MIRROR_HARD_MAX_IMMINENT at council.policy_mirror_hard_max_…. Joined to the route by plan. Opens the merged commit on GitLab (sign-in).MR !3392: MR !3392, merged 2026-11-06: Workspace-signal ci/main push-pipeline cluster lines print the persisted incident or ci_watch class, else class=unverified_main_push cause=<named>, never exter…. Joined to the route by plan. Opens the merged commit on GitLab (sign-in).MR !3395: MR !3395, merged 2026-11-06: Policy mirror brief line prints remaining=<d> and last_attempt=<outcome>:<cause>|none, trips POLICY_MIRROR_HARD_MAX_IMMINENT at council.policy_mirror_hard_max_…. Joined to the route by plan. Opens the merged commit on GitLab (sign-in).MR !3401: MR !3401, merged 2026-11-06: Scheduled-main ci_watch job lookup retries with a larger budget pipeline.ci_watch.job_lookup_retry_timeout_ms (default 3x base) and persists a gitlab_api incid…. Joined to the route by plan. Opens the merged commit on GitLab (sign-in).
- Five unplanned steps merged without serving any waypoints.MR !3393: MR !3393, merged 2026-11-06: Mills canary: update heartbeat fixture. Joined to the route by unplanned. Opens the merged commit on GitLab (sign-in).MR !3396: MR !3396, merged 2026-11-06: feat(mills): Climbs S3 — narrator legs, PublicView and evidence index. Joined to the route by unplanned. Opens the merged commit on GitLab (sign-in).MR !3398: MR !3398, merged 2026-11-06: feat(chronicle): Climbs S5 promql/gitlab altitude, weather, false summits. Joined to the route by unplanned. Opens the merged commit on GitLab (sign-in).MR !3399: MR !3399, merged 2026-11-06: upgrade(deps): klauspost/compress v1.20.2 for GO-2026-6865 (main red since 13:21Z). Joined to the route by unplanned. Opens the merged commit on GitLab (sign-in).MR !3402: MR !3402, merged 2026-11-06: fix(chronicle): compose climbs in a background refresher, memoize sources. Joined to the route by unplanned. Opens the merged commit on GitLab (sign-in).
- The auto-merge rate fell from 0.9108 to 0.9093, moving away from its target.Auto-merge rate (30d) · Nov 6: Summit metric “Auto-merge rate (30d)” on 2026-11-06: 90.9%. Jumps to the altitude chart.
- Cost per merged change fell from 2.2298 to 2.2195, moving toward its target.Cost per merged change · Nov 6: Summit metric “Cost per merged change” on 2026-11-06: 2.2 usd. Jumps to the altitude chart.
- Slice-to-merge p50 fell from 2964.2982 to 2963.8683, moving toward its target.Enqueue-to-merge p50 (press entries) · Nov 6: Summit metric “Enqueue-to-merge p50 (press entries)” on 2026-11-06: 0.2 hours. Jumps to the altitude chart.
- Review holds and a red main pipeline characterized the weather conditions.Review hold · Nov 6: Weather: Review hold (finished work waited for a human review), 2026-11-06 to 2026-11-07 (00:45 UTC), still holding. Jumps to the weather strip.
- Moved
- roadmap: Roadmap waypoint “mirror-hard-max-remaining” (plan-council-policy-mirror-brief-line-prints-remaining-d-and-last-attempt), done.roadmap: Roadmap waypoint “brief-hard-max-imminent-trip” (plan-council-policy-mirror-brief-line-prints-remaining-d-and-last-attempt), done.roadmap: Roadmap waypoint “ci-watch-retry-budget-and-streak-incident” (plan-council-scheduled-main-ci-watch-job-lookup-retries-with-a-larger-bud), done.roadmap: Roadmap waypoint “workspace-signal-main-push-class” (plan-council-workspace-signal-ci-main-push-pipeline-cluster-lines-print-t), done.Cost per merged change · Nov 6: Summit metric “Cost per merged change” on 2026-11-06: 2.2 usd. Jumps to the altitude chart.Enqueue-to-merge p50 (press entries) · Nov 6: Summit metric “Enqueue-to-merge p50 (press entries)” on 2026-11-06: 0.2 hours. Jumps to the altitude chart.
- Slipped
- Auto-merge rate (30d) · Nov 6: Summit metric “Auto-merge rate (30d)” on 2026-11-06: 90.9%. Jumps to the altitude chart.
- Auto-merge rate (30d) 91.1% → 90.9% +33.3 pts rising over 7 days, toward target
- Cost per merged change 2.2 usd → 2.2 usd −0.1 usd falling over 7 days, toward target
- Roadmap gates met 0% → 0% ±0 pts flat over 7 days
- Enqueue-to-merge p50 (press entries) 2,964 hours → 2,964 hours −395 hours falling over 7 days, toward target
Co-moved: On 2026-11-06, 9 changes merged while Auto-merge rate (30d) fell from 0.9108 to 0.9093 (away from its target), Cost per merged change fell from 2.2298 to 2.2195 (toward its target) and Slice-to-merge p50 fell from 2964.2982 to 2963.8683 (toward its target). This is co-movement on the same day only; the record does not show that any change moved a metric.
Narrated by qwen38-27b-autoround-workhorse.