Skip to main content
Lab notebook · libs/fi-fhir

fi-fhir climb

Where fi-fhir started, the summit it is working toward, the rules it may not break, and every merge of the last 30 days, each tied to the roadmap waypoint it served or marked unplanned.

Latest leg: No changes merged on 2026-11-06

Now climbingchecking

Checking the operator for recent events…

Merge-queue moves and narrated legs appear here when the operator is reachable.

Base, summit and ropes

Base

The problem the climb started from

Healthcare integration engines are closed, expensive and hard to observe. fi-fhir is an open, Kubernetes-native engine with profile-driven parsing, canonical events, durable ingestion and delivery, and a Mapping Studio. It is pre-1.0: its capabilities and tests do not yet certify every supported deployment profile or vendor feed, and the climb is toward a 1.0 whose supported matrix they do.

Source: ROADMAP.md#current-status · climbing since 2026-06-01

Summit

Where it is trying to get to, as measured

Roadmap gates met (Now list)
59.4%
target ≥ 100%
19 of 32 checked, 10 verified (9 claimed, unverified)
±0 pts since Nov 7
Main pipeline success ratio (30d)
90.9%
target ≥ 95%
−9.1 pts since Oct 9, away from target
Slice-to-merge p50 on the Mills lane
n/a
target ≤ 2 h
n/a over the window

Source: .loom/climb.yaml · as of 2026-11-07

Ropes

What must hold while climbing

Read from the roadmap and spec · as of 2026-11-07

Altitude

Summit metrics as progress toward their targets: the top line is the target met, and the legend turns each metric’s line on or off. Every merge is a tick on the time axis, coloured by how it was joined to the route; inferred joins are dashed because they are a similarity match, not a key. When merges are too dense to tell apart they become one bar per day, split the same way, and a bar opens that day’s merges. Focus or hover a tick or bar for detail; the arrow keys move along the walk. Shaded bands are weather (main red, outages, breaker and storm holds) merged into episodes; review holds, the queue waiting on a person, run as the thin lane along the top. An inverted red marker stands on a merge that was later reverted (a false summit); flags are release tags. Lines and merges co-move here; nothing on this chart claims one caused the other.

Main red, Oct 30 00:18–02:09 UTC, 1.9 h, fi-fhir: main pipeline red.Review hold, Nov 4 02:45–13:30 UTC, 10.7 h, fi-fhir: finished work waited for a human review.Main red, Nov 4 14:21–14:47 UTC, 0.4 h, fi-fhir: main pipeline red.Main red, Nov 5 01:33–03:20 UTC, 1.8 h, fi-fhir: main pipeline red.
targetrowroadmap textunplannedMain redReview holdreview holds (top lane)
  • Slice-to-merge p50 on the Mills lane no readings: no readings in the window. No line is drawn.

Weather, false summits and base camps: tab to the first mark or hover one for its detail; the arrow keys move between marks.

2026-11-07MR !311join: unplannedoperator lane

docs(loom): declare tier 1 in the fi-fhir climb

Served no written waypoint (off route: owner merge). Cost not recorded.

Commit d5697161fe06 on GitHub →

Weather

4 episodes, about 14.8 hours held in the window (overlaps counted once).

  • Review hold10.8 h1 episode
  • Main red4.1 h3 episodes

Episodes, longest first

  • Review hold Nov 4 02:45–13:30 UTC · 10.7 h · fi-fhir's condition finished work waited for a human review
  • Main red Oct 30 00:18–02:09 UTC · 1.9 h · fi-fhir's condition main pipeline red
  • Main red Nov 5 01:33–03:20 UTC · 1.8 h · fi-fhir's condition main pipeline red
  • Main red Nov 4 14:21–14:47 UTC · 0.4 h · fi-fhir's condition main pipeline red

Review holds are not counted as weather: 3 holds, about 21.4 hours, waited on a person and are drawn as the thin lane along the top of the chart.

Route as written and walked

The waypoints the roadmap lists, in written order, against the merges that served them. A waypoint walked before one written ahead of it is a slip; one with no merge in the window is dimmed.

42 written, 26 served, 6 off route

WrittenWalkedUnplannednow, nextmerge time1234567891011121314151617181920212223242526272829303132Oct 9Oct 15Oct 21Oct 27Nov 2

42 written, 26 served, 6 off route: 42 written waypoints, 26 with a step in the window, 30 steps that served one and 6 off the written route. 18 waypoints were walked out of written order and 16 have no step in the window. The written rail shows the 32 Now and Next roadmap bullets in written order (plan slices and the rest are listed below); the walked rail is on the time axis and holds every step that served a waypoint.

Route as written

Now 32 waypoints

  1. 1.

    Make the merge-train proof real: loom-core adopts only `api` proofs on

    Now · done · walked out of written order · ROADMAP.md:580 @ d5697161

    • MR !2882026-11-01join: roadmap text
    • MR !2902026-11-03join: roadmap text
  2. 2.

    Wire `FI_FHIR_TELEMETRY_CORRELATION_KEY` into production

    Now · walking · walked out of written order · ROADMAP.md:612 @ d5697161

    • MR !2952026-11-04join: roadmap text
  3. 3.

    `make tracing-negative-control` and `structured-logging-negative-control`

    Now · done · walked out of written order · ROADMAP.md:632 @ d5697161

    • MR !2922026-11-04join: roadmap text
  4. 4.

    Run `scripts/check-runtime-config.sh` in CI as `ci/lint-runtime-config.yml`

    Now · walking · walked out of written order · ROADMAP.md:642 @ d5697161

    • MR !3042026-11-05join: roadmap text
  5. 5.

    Document the `FI_FHIR_TRACING_*` and `FI_FHIR_DELIVERY_*` keys in

    Now · done · walked out of written order · ROADMAP.md:651 @ d5697161

    • MR !2942026-11-04join: roadmap text
  6. 6.

    Telemetry docs and changelog drift

    Now · done · walked out of written order · ROADMAP.md:663 @ d5697161

    • MR !3012026-11-04join: roadmap text
  7. 7.

    Close issues #22, #23 and #24

    Now · unverified · no step in this window · ROADMAP.md:672 @ d5697161

  8. 8.

    Land or close the three open merge requests

    Now · unverified · no step in this window · ROADMAP.md:681 @ d5697161

  9. 9.

    edilint pins

    Now · done · walked out of written order · ROADMAP.md:685 @ d5697161

    • MR !2892026-11-01join: roadmap text
  10. 10.

    Re-probe `/api/auth/status` after credential entry and on the

    Now · done · walked out of written order · ROADMAP.md:695 @ d5697161

    • MR !2932026-11-04join: roadmap text
  11. 11.

    Copilot: enable the backend LLM in production

    Now · unverified · no step in this window · ROADMAP.md:702 @ d5697161

  12. 12.

    Terminology-store availability as a capability

    Now · walking · walked out of written order · ROADMAP.md:711 @ d5697161

    • MR !3052026-11-05join: roadmap text
  13. 13.

    Stream capture of real ADT feeds

    Now · planned · no step in this window · ROADMAP.md:723 @ d5697161

  14. 14.

    Engine properties the Engine tab cannot show

    Now · unverified · no step in this window · ROADMAP.md:730 @ d5697161

  15. 15.

    `operator-bundle` e2e timing budget

    Now · done · walked out of written order · ROADMAP.md:734 @ d5697161

    • MR !3022026-11-04join: roadmap text
  16. 16.

    Events browser reads the legacy store

    Now · unverified · no step in this window · ROADMAP.md:743 @ d5697161

  17. 17.

    IDE polish follow-ups from the design uplift

    Now · unverified · no step in this window · ROADMAP.md:748 @ d5697161

  18. 18.

    Connection rows select `observedReplicas` and `totalReplicas`

    Now · walking · walked out of written order · ROADMAP.md:759 @ d5697161

    • MR !3082026-11-05join: roadmap text
  19. 19.

    `?connection=` deep links are read by no page

    Now · unverified · no step in this window · ROADMAP.md:766 @ d5697161

  20. 20.

    Connection edit buffer is never marked dirty

    Now · unverified · no step in this window · ROADMAP.md:770 @ d5697161

  21. 21.

    Definition authoring follow-ups

    Now · planned · no step in this window · ROADMAP.md:774 @ d5697161

  22. 22.

    E1-1 cannot assert STATIC → validated

    Now · planned · no step in this window · ROADMAP.md:781 @ d5697161

  23. 23.

    Workflows: Run event stops calling the refused mutation

    Now · done · walked out of written order · ROADMAP.md:788 @ d5697161

    • MR !2972026-11-04join: roadmap text
  24. 24.

    Shell accessibility nits

    Now · walking · walked out of written order · ROADMAP.md:797 @ d5697161

    • MR !3062026-11-05join: roadmap text
  25. 25.

    Journey evidence reads every session

    Now · unverified · no step in this window · ROADMAP.md:804 @ d5697161

  26. 26.

    Operator deep-link polish

    Now · walking · walked out of written order · ROADMAP.md:808 @ d5697161

    • MR !3072026-11-05join: roadmap text
  27. 27.

    `TestExecAction_RunsAllowedCommand` loses its wall-clock floor

    Now · done · walked out of written order · ROADMAP.md:813 @ d5697161

    • MR !2812026-10-27join: roadmap text
    • MR !3002026-11-04join: roadmap text
  28. 28.

    Budgets 2 and 3

    Now · planned · no step in this window · ROADMAP.md:822 @ d5697161

  29. 29.

    Slice 5.1c-γ official-validator findings

    Now · planned · no step in this window · ROADMAP.md:828 @ d5697161

  30. 30.

    Coverage.relationship for dependents

    Now · planned · no step in this window · ROADMAP.md:834 @ d5697161

  31. 31.

    Trace a successful publish through a webhook sink in the

    Now · done · walked out of written order · ROADMAP.md:836 @ d5697161

    • MR !2962026-11-04join: roadmap text
  32. 32.

    Session preview round-trip cost

    Now · planned · no step in this window · ROADMAP.md:843 @ d5697161

Delivered5 waypoints
  1. 33.

    Security baseline

    Delivered — Workspace navigation, security baseline, diagrams (2026-10-03 → 202… · done · ROADMAP.md:488 @ d5697161

    • MR !2772026-10-09join: roadmap text
  2. 34.

    Composed diagrams

    Delivered — Workspace navigation, security baseline, diagrams (2026-10-03 → 202… · done · ROADMAP.md:496 @ d5697161

    • MR !2782026-10-09join: roadmap text
  3. 36.

    CI proof-profile arm and security pins

    Delivered — Serve tracing, security unblockers, first Mills train rows (2026-10… · done · ROADMAP.md:508 @ d5697161

    • MR !2802026-10-27join: roadmap text
  4. 37.

    Operator-bundle browser gate waits

    Delivered — Serve tracing, security unblockers, first Mills train rows (2026-10… · done · ROADMAP.md:513 @ d5697161

    • MR !2462026-10-27join: roadmap text
    • MR !2532026-10-27join: roadmap text
  5. 38.

    Opt-in serve tracing and lineage logs

    Delivered — Serve tracing, security unblockers, first Mills train rows (2026-10… · done · ROADMAP.md:518 @ d5697161

    • MR !2792026-10-27join: roadmap text

Issues, specs and other waypoints 5 waypoints

  1. 35.

    Delivered — Serve tracing, security unblockers, first Mills train rows (2026-10-27 → 2026-10-30)

    walking · walked out of written order · ROADMAP.md:500 @ d5697161

    • MR !2842026-10-29join: roadmap text
    • MR !2862026-10-29join: roadmap text
  2. 39.

    Backlog

    walking · walked out of written order · ROADMAP.md:1120 @ d5697161

    • MR !2992026-11-04join: roadmap text
  3. 40.

    Issue #23

    walking

    • MR !2832026-10-29join: row
  4. 41.

    Issue #22

    walking

    • MR !2852026-10-29join: row
  5. 42.

    Issue #24

    walking

    • MR !2822026-10-30join: row

Off the written route

6 steps: 6 owner merges.

  • MR !3112026-11-07owner mergesdocs(loom): declare tier 1 in the fi-fhir climb
  • MR !3092026-11-05owner mergesdocs(loom): declare the fi-fhir climb in .loom/climb.yaml
  • MR !3032026-11-04owner mergesdocs: Mills push close-out — ten rows merged, kill-test passed, lane mechanics recorded
  • MR !2982026-11-04owner mergesbuild(docker): retry go mod download after transient proxy.golang.org stream resets
  • MR !2912026-11-03owner mergesdocs: Mills push 2026-11 — spec 43, roadmap rows and acceptance, decision and worklog
  • MR !2872026-11-01owner mergesdocs(roadmap): 2026-10-31 reconciliation — tracing follow-ups delivered, hollow Mills train proofs, Now re-triaged

Legs

One chapter per day, narrated from the day’s merges, roadmap changes, metric readings and weather. Every sentence carries its evidence: a chip opens the merge, the roadmap line as written, the metric point or the weather band it rests on, and a sentence whose evidence could not be published is left out and counted. A day narrated again says “revised” and keeps its earlier versions; a day the model could not narrate within the rules is written from a fixed template and marked as one.

3 chapters, newest first. Arrow keys move between chapters; Tab moves through a chapter’s citations.

  1. Leg for descendingtemplate: written from the deterministic template, not by the model

    No changes merged on 2026-11-06

    Slipped
    Main pipeline success ratio (30d) · Nov 6: Summit metric “Main pipeline success ratio (30d)” on 2026-11-06: 87%. Jumps to the altitude chart.
    • Main pipeline success ratio (30d) 89.5% → 87% −0.5 pts falling over 7 days, away from target

    Co-moved: On 2026-11-06, 0 changes merged while Main pipeline success ratio (30d) fell from 0.8947 to 0.8696 (away from its target). This is co-movement on the same day only; the record does not show that any change moved a metric.

  2. Leg for ascending

    libs/fi-fhir merged 6 changes, moving gates and CI metrics toward targets.

    Moved
    ROADMAP.md:642: Roadmap waypoint “Run `scripts/check-runtime-config.sh` in CI as `ci/lint-runtime-config.yml`” (Now), walking. Opens the line as written, at the commit it was read from.ROADMAP.md:808: Roadmap waypoint “Operator deep-link polish” (Now), walking. Opens the line as written, at the commit it was read from.ROADMAP.md:759: Roadmap waypoint “Connection rows select `observedReplicas` and `totalReplicas`” (Now), walking. Opens the line as written, at the commit it was read from.ROADMAP.md:711: Roadmap waypoint “Terminology-store availability as a capability” (Now), walking. Opens the line as written, at the commit it was read from.ROADMAP.md:797: Roadmap waypoint “Shell accessibility nits” (Now), walking. Opens the line as written, at the commit it was read from.Main pipeline success ratio (30d) · Nov 5: Summit metric “Main pipeline success ratio (30d)” on 2026-11-05: 89.5%. Jumps to the altitude chart.Roadmap gates met (Now list) · Nov 5: Summit metric “Roadmap gates met (Now list)” on 2026-11-05: no sample that day in the public series. Jumps to the altitude chart.
    • Main pipeline success ratio (30d) 87.5% → 89.5% −10.5 pts falling over 7 days, away from target
    • Roadmap gates met (Now list) 9.4% → 31.3% +28.1 pts rising over 7 days, toward target

    Co-moved: On 2026-11-05, 6 changes merged while Main pipeline success ratio (30d) rose from 0.875 to 0.8947 (toward its target) and Roadmap gates met (Now list) rose from 0.0938 to 0.3125 (toward its target). This is co-movement on the same day only; the record does not show that any change moved a metric.

    Narrated by qwen38-27b-xtx-warm-canary.

  3. Leg for descending

    libs/fi-fhir merged 12 changes on 2026-11-04, serving 10 waypoints while CI green ratio fell to 0.875.

    Moved
    ROADMAP.md:695: Roadmap waypoint “Re-probe `/api/auth/status` after credential entry and on the” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:651: Roadmap waypoint “Document the `FI_FHIR_TRACING_*` and `FI_FHIR_DELIVERY_*` keys in” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:632: Roadmap waypoint “`make tracing-negative-control` and `structured-logging-negative-control`” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:788: Roadmap waypoint “Workflows: Run event stops calling the refused mutation” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:663: Roadmap waypoint “Telemetry docs and changelog drift” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:734: Roadmap waypoint “`operator-bundle` e2e timing budget” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:813: Roadmap waypoint “`TestExecAction_RunsAllowedCommand` loses its wall-clock floor” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:612: Roadmap waypoint “Wire `FI_FHIR_TELEMETRY_CORRELATION_KEY` into production” (Now), walking. Opens the line as written, at the commit it was read from.ROADMAP.md:836: Roadmap waypoint “Trace a successful publish through a webhook sink in the” (Now), done. Opens the line as written, at the commit it was read from.ROADMAP.md:1120: Roadmap waypoint “Backlog”, walking. Opens the line as written, at the commit it was read from.
    Slipped
    Main pipeline success ratio (30d) · Nov 4: Summit metric “Main pipeline success ratio (30d)” on 2026-11-04: 87.5%. Jumps to the altitude chart.
    • Main pipeline success ratio (30d) 90% → 87.5% −12.5 pts falling over 7 days, away from target
    • Roadmap gates met (Now list) 9.4% → 9.4% +6.3 pts rising over 7 days, toward target

    Co-moved: On 2026-11-04, 12 changes merged while Main pipeline success ratio (30d) fell from 0.9 to 0.875 (away from its target). This is co-movement on the same day only; the record does not show that any change moved a metric.

    Narrated by qwen38-27b-xtx-warm-canary.

Where this comes from

Committed snapshotgenerated 2026-11-07 15:31 UTC ()

This page is built from the committed snapshot of the operator document. Served from the snapshot because: operator not configured. Sanitized from the Mills chronicle read model: run, backlog and roadmap ids are hashed; titles, headlines and narrated sentences are scrubbed of paths, URLs, credentials, addresses and unpublished repository names; only climbs on published repositories are listed. Merge request numbers and short commit hashes are kept because they are public; so is the name of the model that narrated each leg, while its backend, prompts and traces are not. Merge request numbers are shown as text because the GitLab they live on needs a sign-in.

fi-fhir climb | Cody Blevins