Leg for ascendingtemplate: written from the deterministic template, not by the model
17 changes merged on 2026-11-06
- 17 changes merged; 0 served a waypoint and 17 were unplanned.MR !1307: MR !1307, merged 2026-11-06: docs(loom): pre-register S9, the Wan decode A/B on the 0.32 base and two opt-in kill-tests. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1313: MR !1313, merged 2026-11-06: docs(loom): gate runbook D3 (Qwen-Image in-pod) on a multi-render check after S9's finding. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1314: MR !1314, merged 2026-11-06: docs(loom): S9 result: the runtime base fails T2V, VACE and Stable Audio; expandable_segments with offload is the cause. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1315: MR !1315, merged 2026-11-06: docs(loom): runbook D3 is outside S9's failure pattern (no CPU offload); add an offload log check. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1289: MR !1289, merged 2026-11-06: ops(controller): roll the k3s controller to master 51e6bd81 so vllmVersion takes effect (!1281, !1291) [LIVE-IMPACTING, owner window]. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1255: MR !1255, merged 2026-11-06: ops(proxy): turn on the InferenceJob API and roll the proxy to master 51e6bd81 [LIVE-IMPACTING, owner window]. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1316: MR !1316, merged 2026-11-06: docs(loom): owner-window execution log, phase A done. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1257: MR !1257, merged 2026-11-06: ops(models): give the gte CPU twin 12 threads and a 14-core limit [LIVE-IMPACTING, owner window]. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1261: MR !1261, merged 2026-11-06: ops(gfx906): repin the Radeon VII runtime to the pyannote layer [LIVE-IMPACTING, owner window G2]. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1317: MR !1317, merged 2026-11-06: ops(scheduler): pin flexinfer-scheduler by digest in values-k3s. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1319: MR !1319, merged 2026-11-06: fix(plugin-common): segmented winners compiled against the live KV cache (Q2) + S5 stage A result (fail). Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1262: MR !1262, merged 2026-11-06: ops(models): pyannote diarization lane + provisional certificate for KT-DIAR [LIVE-IMPACTING, owner window G3]. Joined to the route by unplanned. Opens the merged commit on GitHub.MR !1321: MR !1321, merged 2026-11-06: revert(models): back out the pyannote KT-DIAR lane (!1262); the gfx906 runtime has no pyannote backend. Joined to the route by unplanned. Opens the merged commit on GitHub.
- 1 weather event held the climb.Main red · Nov 6: Weather: Main red (main pipeline red), 2026-11-06 to 2026-11-07 (23:19 UTC), still holding. Jumps to the weather strip.
- Merges per week moved from 81 to 100.Merges per week · Nov 6: Summit metric “Merges per week” on 2026-11-06: 100 merges. Jumps to the altitude chart.
- Master pipeline success ratio (7d) moved from 0.66 to 0.6452.Master pipeline success ratio (7d) · Nov 6: Summit metric “Master pipeline success ratio (7d)” on 2026-11-06: 64.5%. Jumps to the altitude chart.
- Proxy request success ratio (rolling 1d) moved from 0.9946 to 0.9954.Proxy request success ratio (rolling 1d) · Nov 6: Summit metric “Proxy request success ratio (rolling 1d)” on 2026-11-06: 99.4%. Jumps to the altitude chart.
- The day's finishing digest reads: Finished goods for 2026-11-06: 6 bolts, 0 live, 0 pending rollout, docs mirror 79 files drifteddigest · Nov 6: The Mills daily digest for 2026-11-06: that day's merges and run counts. Jumps to the leg for that day.
- Moved
- Merges per week · Nov 6: Summit metric “Merges per week” on 2026-11-06: 100 merges. Jumps to the altitude chart.Proxy request success ratio (rolling 1d) · Nov 6: Summit metric “Proxy request success ratio (rolling 1d)” on 2026-11-06: 99.4%. Jumps to the altitude chart.
- Slipped
- Master pipeline success ratio (7d) · Nov 6: Summit metric “Master pipeline success ratio (7d)” on 2026-11-06: 64.5%. Jumps to the altitude chart.
- Merges per week 81 merges → 100 merges +27 merges rising over 7 days, toward target
- Master pipeline success ratio (7d) 66% → 64.5% −17.1 pts falling over 7 days, away from target
- Proxy request success ratio (rolling 1d) 99.5% → 99.5% +0.8 pts rising over 7 days, toward target
Co-moved: On 2026-11-06, 17 changes merged while Merges per week rose from 81 to 100 (toward its target), Master pipeline success ratio (7d) fell from 0.66 to 0.6452 (away from its target) and Proxy request success ratio (rolling 1d) rose from 0.9946 to 0.9954 (toward its target). This is co-movement on the same day only; the record does not show that any change moved a metric.